Answer first

A credible proposal states what heat is being served, when it is needed, at what temperatures and with what resilience. It then shows how the selected system performs across the load range—not only at one peak condition.

The design also defines metering and acceptance tests. Without a post-install measurement plan, the client cannot distinguish weather, occupancy, control and equipment performance.

8760 hours

Annual modelling can test load and performance across the operating year

View source
N+1 where justified

Resilience strategy follows operational consequence, not habit

View source
Meter the boundary

Heat and electricity measurements need a defined system boundary

View source
Ask about your home · no obligation

Turn building data into a credible heat-pump design brief

Tell FLO about the building, present heat source, use pattern and project stage. The first conversation can identify the surveys, data and decision-makers needed for a credible proposal.

Phone or email (required)

Enter at least one so FLO can respond to your enquiry.

What happens next: FLO reviews your question and property details, then contacts you to discuss them.

Start with your own questionNo survey commitmentMCS certified · NAP-689870800 043 1188

Sending this form asks FLO to respond to your enquiry. Privacy policy

Create the design brief and data pack

Gather drawings, fabric, occupancy, interval energy, plant logs, temperatures, ventilation, hot water, process loads, planned changes and comfort complaints. Validate unusual spikes rather than blindly sizing to them.

Agree project goals: carbon, cost, plant replacement, cooling, capacity expansion, resilience or compliance. Different goals can lead to different systems.

Model source, sink and temperature

Assess air, ground, water and recoverable waste heat against availability, planning, drilling or abstraction, noise, maintenance and seasonal temperature.

For each heat sink, identify required flow and return temperatures and whether emitters or coils can change. Reducing unnecessary temperature lift improves the opportunity.

Design plant arrangement and controls

Select modular or single equipment, storage, pumps, headers, heat exchangers, backup, redundancy and hydraulic separation from the load profile. Check minimum turndown as carefully as peak capacity.

The sequence of operation defines staging, weather compensation, hot-water priority, defrost, backup and fault behaviour. A good schematic without a control narrative is incomplete.

Coordinate infrastructure and verification

Confirm electrical capacity, harmonic or starting considerations, network process, plant space, structure, acoustics, drainage, fire strategy, access and lifting. Plan phasing around live operations.

Specify meters, trend points, commissioning seasons, acceptance criteria and aftercare. Compare measured heat, electricity and service with the model on the same boundary.

What to read next

Related answers and services

Questions people also ask

Can annual fuel use size commercial heat pumps?+

It supports a sense check, but peak timing, temperatures, occupancy and plant operation need separate evidence.

Is one large heat pump better than several modules?+

Not universally. Turndown, redundancy, space, controls, maintenance and load profile decide.

Why specify heat meters?+

They allow delivered heat and system efficiency to be assessed against electricity on a defined boundary.