The short answer
Start free. Expect the final figure to be based on your home.
FLO’s first quote conversation is free and carries no obligation. It helps establish whether the property, current heating and likely project are a sensible match before arranging the detailed assessment needed for a final specification.
What FLO needs for a useful first response
The property
House type, bedroom count and postcode give an initial sense of scale, local conditions and practical coverage.
Current heating
Gas, oil, LPG, direct electric and existing heat-pump systems each create a different starting point.
Your aim
Tell FLO whether you are researching, actively comparing quotes, planning a renovation or trying to solve a heating problem.
First quote versus surveyed proposal
An early figure can help you decide whether to continue. It should not pretend to be a complete specification. Before you commit, the proposed system should be checked against the building’s heat loss, hot-water needs, emitters, electrical supply, outdoor position and installation routes.
- A room-by-room heat-loss basis and proposed design conditions.
- Heat pump make, model and output.
- Radiator, pipework, cylinder, controls and electrical changes.
- Outdoor-unit position, drainage, access and noise assumptions.
- Expected performance, commissioning, warranty and aftercare.
- A clear total before funding, with exclusions stated.
Can the quote include Scottish funding?
Yes. Tick the funding option in FLO’s quote journey and the team can keep likely grant and loan questions inside the same conversation. This is useful because a headline grant amount is not the same as a complete project price.
Check the main Scottish heat pump grant eligibility rules before relying on funding in your budget. Home Energy Scotland makes the final decision, and eligible work must not begin before a written offer is issued.
How to compare heat pump quotes fairly
Do not compare only the outdoor-unit price. Check whether each installer has included the same emitter upgrades, cylinder, controls, electrical work, removal, making good, commissioning and aftercare. A lower number can simply represent a smaller scope.
Ask each installer to explain the assumed flow temperature and seasonal performance. MCS guidance places design and consumer documentation at the centre of a sound installation process.
Independent sources
Scheme rules and guidance can change. Check these sources before making a financial or planning decision.