Answer first

Insulation can reduce heat demand, emitter size and running cost. The key is to design against the condition the home will actually be in when the system operates.

If improvements will happen later, ask for current and improved heat-loss cases. Make sure the chosen heat pump can modulate acceptably after the load falls.

75%

Current Scottish efficiency grants may cover up to 75% of eligible measure costs within scheme caps

View source
Current + future

Both fabric cases can be modelled when works are genuinely planned

View source
Whole home

Heating, hot water and fabric choices should be coordinated

View source
£0 survey · written quote · no obligation

Plan insulation and heating in the right order

Tell FLO about the property and current heating. A survey turns the general guidance into a room-by-room design and written quote for the complete system.

Phone or email (required)

Enter at least one so FLO can respond to your enquiry.

What happens next: FLO reviews the property details and contacts you to arrange the right survey and written proposal.

£0 survey & written quoteNo pressure or obligationMCS certified · NAP-689870800 043 1188

Sending this form asks FLO to respond to your enquiry. Privacy policy

Reduce avoidable demand first where it makes sense

Loft, cavity, floor and appropriate wall measures can cut heat loss. Draught treatment may improve comfort as much as the calculated saving suggests.

Prioritise measures that are suitable for the construction and reasonably certain to be completed. Solid-wall and traditional buildings need moisture-aware advice.

Do not design against imaginary upgrades

If insulation is only an aspiration, sizing the heat pump for the improved home risks underheating the current home. The assumptions should be written and tied to the installation sequence.

Where work follows later, consider how the unit will modulate at the reduced load and whether emitter changes remain appropriate.

Funding has its own evidence and timing

Home Energy Scotland currently distinguishes heat-pump funding from energy-efficiency funding. EPC recommendations can be required for supported fabric measures.

Check current rules before ordering work and wait for the written offer when applying for funding. Do not let a contractor start early and assume support will be retrospective.

A survey can create the sequence

The useful output is not simply “insulate first” or “install first”. It is a list of measures, their effect on heat loss and the dependency between trades.

That lets the homeowner avoid paying twice for radiators, pipe routes or finishes and keeps the final quote aligned with the finished property.

What to read next

Related answers and services

Questions people also ask

Does a heat pump require an EPC?+

Current Scottish heat-pump funding does not require an EPC solely for the renewable system, but efficiency measures can have EPC conditions.

Can an old stone house use a heat pump?+

Often yes, with property-specific heat loss, emitters and moisture-appropriate fabric decisions.

Will insulation make the heat pump smaller?+

It can if it materially reduces the design heat loss before final equipment selection.

Evidence used for this answer

Figures are explained in context and links go to the independent source. Prices, tariffs, scheme rules and standards can change, so check the source again before making a financial or technical decision.